Vacancy: Co-operator of a 400 kW hybrid waste to energy facility at Gyankobaa

Date 17 Nov 2020
Location Gyankobaa
Job Type Contract
Industry NGO/IGO/INGO
Description


Company Profile


WASCAL is a research and education-focused institute designed to provide knowledge and climate services that should help tackle the climate change challenge and thereby enhance the resilience of human and environmental systems. It does so by strengthening the research capacity and infrastructure in West Africa related to climate change by pooling the expertise of ten West African countries and Germany. The West African countries include: Benin, Burkina Faso, Cape Verde, Côte d‘Ivoire, The Gambia, Ghana, Mali, Niger, Nigeria, Senegal and Togo.




Job Description


Co-operator of a 400 kW hybrid waste to energy facility at Gyankobaa



The hybrid waste to energy as a sustainable solution for Ghana project is looking for a Ghanaian-owned company with expertise in waste management and the operation of a waste to energy facility to be a partner in the operational consortium to operate the 400 kW pilot waste to energy power plant at Gyankobaa in the Ashanti Region of Ghana. The plant is worth an investment of approx..3 Million Euros.



The hybrid facility consists of a 100 kW biogas plant, a 100 kW pyrolysis plant and approximately 200 kW of solar PV grid ready power plant. In addition the facility has a waste sorting plant, a compost area, offices for staff and approximately 6 acres of land which has been duly fenced.

The facility is run in the form of a consortial ownership.



The co-operator alone doesn’t own the facility, instead will be a member of the consortium with the assigned tasks stated below.




Required Skills or Experience


Requirements




  1. The co-operator will be required to bring at a minimum investment of 100,000 Euros by the end of the project funding phase (31.12.2023). This money will be blocked in the consortium ownership account as an assurance for commitment and seriousness of the co-operator.

  2. The co-operator must be in a position to run the plant efficiently for a minimum of 10 years after the end of the funding phase.



In addition, the co-operator will be, among other things, required to;




  • Close power purchasing agreement with off-taker(s) for 200kWp solar pV by December, 2020,

  • Close power purchasing agreement with off-taker(s) for heat from biogas and pyrolysis plant by October 2021,

  • Close power purchasing agreement with off-taker(s) for electricity from biogas and pyrolysis fuel by October 2021,

  • Based on business case to extend the off-taker agreement to directly purchase the fuels (Biogas and pyrolysis oil)

  • Achieve 100% operational capacity/run at full scale by the end of the project funding phase,

  • Guarantee the operation of the facility for a minimum of 10 years beyond the funding phase

  • Ensure that the facility is always kept running and financially liquid,

  • Ensure that the capacity of the plant is expanded during the 10 years by at least doubling the capacities of fuel or electricity generation or waste management capacities.

  • Ensure that the assets of the facility are kept functional at all times,

  • Guarantee the un-interrupted supply of waste from the municipality to keep the facility running,

  • Close deals with adjacent municipalities within the 30 km radius where it makes economic sense to open up supply lines to ensure that there is enough waste to treat,

  • Explore additional revenue stream from all sources include sale of compost, scrap metals, and PET bottles, etc

  • Commit to the utilization of the additional land for peripheral business which may utilize the power in the event we do not have any off-taker (worse-case scenario),

  • Commit to the development of additional business or supporting start-ups especially in the area of circular economy. Expansion through integration and development of new startups within the facility,

  • Commit to investing more than 60% of the profit from running the facility into maintaining, expanding and improving the efficiency of the plant,

  • The remaining profit may be shared according to the shareholding capacities of the parties

  • Assist in setting-up professional company structure, and

  • Work effectively with the partners to ensure the smooth running of the facility.





How To Apply


Interested co-operators can express their interest through a letter till the 19th November, 2020 to [email protected]



Please visit www.wascal.org for further information.




Note



Please note, employers receive numerous applications per posting and will only shortlist the most qualified candidates. Also
Jobsinghana.com is not involved in any decision made by an employer/recruiter and therefore does not guarantee that applications sent
will result in a candidate being shortlisted/selected for that position.
How to Apply Click Here


Scroll to Top